07 January:
Overview of Geophysics & Geophysical Imaging
08 January:
Lab 1 Thought Exercise
09 January:
Introduction to the Wave Equation
11 January:
Introduction to the Wave Equation; Seismic Velocity
14 January:
Instrumentation: The Seismometer
15 January:
Lab 2: Intro to Refract & Reflect
16 January:
Fundamentals of Wave Theory
18 January:
Seismic Reflection Concepts (& prep for Schroeder lab on Tuesday)
23 January:
Seismic Amplitudes (Spreading & Attenuation)
25 January:
Seismic Amplitudes: Zoeppritz Equations
28 January:
The Seismic Refraction Method
29 January:
Lab 3: Amplitude Relations
30 January:
Seismic Refraction: Dipping Layers
01 February:
Seismic Refraction Cont'd: Multiple Dipping Layers
04 February:
Seismic Refraction Cont'd: More Complex Velocity & Thickness Variations
05 February:
Lab 4: Seismic Refraction
06 February:
The Seismic Reflection Method
08 February:
Seismic Reflection: x2 - t2 and Dix Equation
11 February:
Seismic Reflection: More on NMO (Dipping Layer)
12 February:
Lab 5: Seismic Reflection
13 February:
Seismic Reflection: Some practical considerations
15 February:
Seismic Reflection: Data Processing
19 February:
Seismic Reflection: Data Processing II
20 February:
Review Lab 3; Seismic Interpretation
22 February:
Review Lab 4
25 February:
Ground Penetrating Radar
26 February:
Lab 6: GPR on the SECF
29 February:
GPR
03 March:
Global Positioning System
04 March:
Global Positioning System
05 March:
Intro Gravity: Laplace Eqn, Measurement
17 March:
Gravity, Gravity Reductions
18 March:
Gravity Reductions, Lab 7: Gravity Modeling
(gravity.dat)
19 March:
Gravity Modeling
21 March:
Magnetism
24 March:
Earth's Magnetic Field
26 March:
Magnetometers and Data Reduction
28 March:
Modeling Magnetic Anomalies
31 March:
Modeling Magnetic Bodies; DC Resistivity
02 April:
DC Resistivity
04 April:
DC Resistivity (Arrays and Modeling)
07 April:
DC Resistivity Modeling
09 April:
DC Resistivity and IP
11 April:
Spontaneous Potential (IP)
14 April:
Magnetotelluric (MT)
15 April:
Lab 8 Assignment
(Seismic.xls)
(Resistivity.xls)
(Magnetic.xls)
16 April:
Wireline Logging
18 April:
Wireline Logging; Lab 6
21 April:
Wireline Logging; Lab 7
|